Biggest Multiparts in Melbourne
3 Llody Street Kensington WEST MELBOURNE TERMINAL STATION
30 000 x 3 490 pit clear openingAccess Covers Australia developed a new beam system for the 116-part multipart unit to address problem with depthSlab depth was an issue, new design beam housing was requiredOvercome requirements where all materials required to be sameNew design tested and approved by Beca Engineers, Ausnet and MultiworksNew design was tested, inspected and approved by Beca, Ausnet, BGB Electrical & MultiworksThe new beam and housing design reduced on site installation time by more than 100 hoursUnit was delivered in 20 smaller units fully assembled, could not deliver the units quick enough to match installationCost saving on site man hours, material approx. $80 - $100KSale to customer $200KSatisfied customerPatented System