Biggest Multiparts in Melbourne

3 Llody Street Kensington WEST MELBOURNE TERMINAL STATION

30 000 x 3 490 pit clear openingAccess Covers Australia developed a new beam system for the 116-part multipart unit to address problem with depthSlab depth was an issue, new design beam housing was requiredOvercome requirements where all materials required to be sameNew design tested and approved by Beca Engineers, Ausnet and MultiworksNew design was tested, inspected and approved by Beca, Ausnet, BGB Electrical & MultiworksThe new beam and housing design reduced on site installation time by more than 100 hoursUnit was delivered in 20 smaller units fully assembled, could not deliver the units quick enough to match installationCost saving on site man hours, material approx. $80 - $100KSale to customer $200KSatisfied customerPatented System

Access Covers Australia achieve full Intertek SAI Global Industry Certification

Access Covers Australia achieve full Intertek SAI Global Industry Certification

Access Covers Australia is proud to achieve all three Intertek SAI Global certifications across: Quality - ISO 9001 Environment - ISO 14001 Health...
Largest Multipart in Melbourne

Largest Multipart in Melbourne

3 Llody Street Kensington WEST MELBOURNE TERMINAL STATION 30 000 x 3 490 pit clear opening Access Covers Australia developed a new beam system for...
Speedyform

Speedyform

Access Covers “Speedyform” Manufactured in various widths and depths, Light, medium & high options Tie into slab structure minimizing concrete...