Project Background:

Access Covers Australia was engaged by a global client to supply HV pits and large custom drainage pits for Australia’s largest recycling facility. Timelines were key to being awarded the contract, with deliveries required for some pits within 1 week.

 

Solutions & Products Provided:

 

  • All Products Trafficable - HV Pit sizes ranged from 1200x1200x1200mm to 4500x3500x4000mm.

  • RPEQ - State-specific engineering.

  • ISO Accreditation was invaluable, particularly when satisfying the QA requirements.

  • Product Features:
    > The largest pit had 156 bell mouths cast into it.
    >Drainage pits required grout tubes cast into the roof slabs to tie in the structure together (fully certified).

 