Largest Multipart in Melbourne

3 Llody Street Kensington WEST MELBOURNE TERMINAL STATION

  • 30 000 x 3 490 pit clear opening
  • Access Covers Australia developed a new beam system for the 116-part multipart unit to address problem with depth
  • Slab depth was an issue, new design beam housing was required
  • Overcome requirements where all materials required to be same
  • New design tested and approved by Beca Engineers, Ausnet and Multiworks
  • New design was tested, inspected and approved by Beca, Ausnet, BGB Electrical & Multiworks
  • The new beam and housing design reduced on site installation time by more than 100 hours
  • Cost saving on site man hours, material approx. $80 - $100K
  • Patented System